1 |
Preparation of documents and issuance of permits to execute earth-moving works |
1 package of documents |
2718,52 |
2 |
Coordination of design documentation |
1 coordination |
12 566,74 |
3 |
Participation in the working commission for acceptance of equipment after installation (reconstruction) |
1 acceptance |
4 290,21 |
4 |
Diagnostics of power transformers 6-10 kV |
1 test |
4 745,12 |
5 |
Diagnostics of power transformers 35 kV |
1 test |
9 398,02 |
6 |
Dismantling/mounting of branches from OPTL (overhead power transmission lines) to the entry into buildings |
1 km |
1 251,05 |
7 |
Installation of wire/cable from support to the entry into the building without dummy support 0.22 kV |
1 km |
869,73 |
8 |
Installation of wire/cable from support to the entry into the building without dummy support 0.38 kV |
1 km |
1 066,18 |
9 |
Installation of single-phase entry of OPTL, CL-0.4 kV for utility mains |
1 connection |
2 518,85 |
10 |
Installation of three-phase entry of OPTL, CL-0.4 kV for utility mains |
1 connection |
3 461,12 |
11 |
Installation of the lead-in of user electrical installations in networks of OPTL, CL-0.4 kV for organizations |
1 connection |
3 690,31 |
12 |
Installation of the lead-in of user electrical installations in networks of OPTL, CL-6-10 kV |
1 connection |
9 395,33 |
13 |
Installation of vertical riser cable on support |
5 м CL |
1 712,98 |
14 |
Installation of terminal heat shrink coupling (without the cost of materials) |
1 pc |
4 629,48 |
15 |
Installation of connecting heat shrink coupling (without the cost of materials) |
1 pc |
7 037,58 |
16 |
Installation of DB (distributing board) on support |
1 pc |
2 617,39 |
17 |
Access clearance of outside adjustment organizations to DB and TS |
1 access clearance |
8 788,52 |
18 |
Access clearance to works and supervision of work production in the protection area |
1 access clearance |
3 264,26 |
19 |
Access clearance for the personnel of contracting organization during installation works on CL-0.4 – 10 kV |
1 access clearance |
6 429,1 0 |
20 |
Access clearance for the personnel of contracting organization during installation works on OPTL-0.4 kV |
1 access clearance |
6 127,02 |
21 |
Access clearance for the personnel of contracting organization during installation works on OPTL-10 kV with wire lowering |
1 access clearance |
9 939,12 |
22 |
Access clearance for the personnel of contracting organization during installation works on OPTL-10 kV without wire lowering |
1 access clearance |
8 351,79 |
23 |
Testing of TS equipment with one transformer |
1 test |
8 873,84 |
24 |
Testing of TS equipment with two transformers |
1 test |
13 461,12 |
25 |
Testing of voltage transformer 6-10 kV |
1 test |
2 879,29 |
26 |
Testing of power transformers |
1 test |
5 188,57 |
27 |
Testing of voltage transformers and current transformers |
1 test |
3 383,92 |
28 |
Testing of measuring current transformers |
1 transformer |
7 467,14 |
29 |
Checkout of current transformers |
1 transformer |
5 866,74 |
30 |
High-voltage testing of equipment for cells 6-10 kV |
1 test |
9 840,77 |
31 |
High-voltage testing of equipment for 1 cell 6-10 kV |
1 test |
5 647,65 |
32 |
Testing of power cables 6-10 kV |
1 test |
9 702,56 |
33 |
Testing of power cables 0.4 kV |
1 test |
8 215,12 |
34 |
Testing of valve-type arresters 6-10 kV |
1 test |
4 837,53 |
35 |
Testing of switch 6-10 kV |
1 test |
10 679,95 |
36 |
Testing of electrical installations for an individual dwelling house |
1 test |
3 657,95 |
37 |
Testing of CL-35 kV |
1 test |
7 183,62 |
38 |
Testing of full resistance of “phase-zero” loop |
1 test |
2 107,31 |
39 |
Check of the presence of circuit between grounding wire and grounded elements (100 points) |
1 test |
1 193,69 |
40 |
Primary current injection test for single-pole circuit breaker |
1 test |
333,35 |
41 |
Primary current injection test for three-pole circuit breaker up to 50 A |
1 test |
833,37 |
42 |
Primary current injection test for three-pole circuit breaker up to 200 A |
1 test |
1 166,73 |
43 |
Primary current injection test for three-pole circuit breaker over 200 A |
1 test |
1 500,06 |
44 |
Measurement of the resistance of TS grounding circuit |
1 circuit |
8 262,55 |
45 |
Measurement of the resistance of support grounding circuit |
1 circuit |
2 568,37 |
46 |
Measurement of insulation resistance |
1 test |
1 728,61 |
47 |
Measurement of the resistance of transformer windings 35 kV against alternating current |
1 measurement |
4 575,48 |
48 |
Measurement of the resistance of transformer windings 35 kV against direct current |
1 measurement |
1 095,33 |
49 |
Measurement of distances from wires of OPTL-0.4 – 10 kV to the ground surface |
1 measurement |
576,25 |
50 |
Replacement of automatic device up to 400 A |
1 automatic device |
2 944,51 |
51 |
Replacement of automatic device over 400 A |
1 automatic device |
3 333,3 0 |
52 |
Replacement of automatic device over 1,000 A |
1 automatic device |
3 929,33 |
53 |
Replacement of load switch |
1 pc |
4 196,42 |
54 |
Replacement of light panel |
1 pc |
8 193,04 |
55 |
Replacement of strut |
1 pc |
2 034,45 |
56 |
Replacement of fuse |
1 pc |
318,96 |
57 |
Replacement of main switch up to 400 A |
1 pc |
2 302,15 |
58 |
Replacement of main switch over 400 A |
1 pc |
5 025,48 |
59 |
Replacement of the segment of CL-0.4 – 10 kV up to 5 metres (the first 5 metres) |
1 segment |
2 078,02 |
60 |
Replacement of arresters |
1 pc |
2 325,29 |
61 |
Replacement of low voltage output terminals |
1 pc |
2 944,51 |
62 |
Replacement of lighting fixtures with mercury lamp on supports |
1 pc |
2 413,45 |
63 |
Replacement of lighting fixtures with mercury lamp on supports |
1 pc |
2 177,55 |
64 |
Replacement of lighting fixtures with luminescent lamp on supports |
1 pc |
1 072,05 |
65 |
Replacement of lighting fixtures with filament lamp on supports |
1 pc |
612,4 0 |
66 |
Replacement of mercury lamps for street illumination |
1 pc |
535,9 0 |
67 |
Replacement of filament lamps for street illumination |
1 pc |
427,85 |
68 |
Replacement of start-regulating devices in the lighting fixture |
1 pc |
861,35 |
69 |
Replacement of the lighting fixture bracket |
1 pc |
737,45 |
70 |
Replacement of linear disconnector with grounding blades without replacement of drive |
1 pc |
2 087,98 |
71 |
Device for repeated grounding and grounding circuit of OPTL-0.4 kV |
1 segment |
5 354,48 |
72 |
Installation (replacement) of current transformer (TPL, TK-20) |
1 pc |
1 384,77 |
73 |
Installation (replacement) of single-phase single-tariff meter (metering device is included into the cost of services) |
1 pc |
1 550,00 |
74 |
Installation (replacement) of single-phase single-tariff meter with circuit breaker (materials and metering device are included into the cost of services) |
1 pc |
1 890,00 |
75 |
Installation (replacement) of single-phase double-tariff meter (metering device is included into the cost of services) |
1 pc |
2 350,00 |
76 |
Installation (replacement) of single-phase double-tariff meter with circuit breaker (materials and metering device are included into the cost of services) |
1 pc |
2 650,00 |
77 |
Installation (replacement) of three-phase single-tariff meter (metering device is included into the cost of services) |
1 pc |
2 970,00 |
78 |
Installation (replacement) of three-phase single-tariff meter with circuit breaker (materials and metering device are included into the cost of services) |
1 pc |
3 240,00 |
79 |
Conduction of instrumental checkout of the electricity metering station |
1 checkout |
1 010,00 |
80 |
Cut-off of OPTL and CL 0.4 kV according to application of the sales organization |
1 cut-off |
2 150,00 |
81 |
Energization of OPTL and CL 0.4 kV according to application of the sales organization |
1 energization |
2 150,00 |
82 |
Installation (replacement) of valve-type arrester RVO-10 |
1 pc |
488,8 0 |
83 |
Installation (replacement) of valve-type arrester RVO-0.5 |
1 pc |
468,42 |
84 |
Alignment of support 0.4 – 10 kV |
1 pc |
1 779,1 0 |
85 |
Installation of reinforced concrete attachment |
1 pc |
1 578,95 |
86 |
Installation of insulators on mounted support |
1 pc |
529,39 |
87 |
Installation of grounding lowering on reinforced concrete support 0.4 – 10 kV |
1 pc |
676,69 |
88 |
Installation of grounding lowering on wooden support 0.4 – 10 kV |
1 pc |
693,95 |
89 |
Installation of TS grounding circuit |
1 pc |
5 628,86 |
90 |
Installation of linear disconnector without grounding blades without drive replacement |
1 pc |
2 407,97 |
91 |
Installation of linear disconnector without grounding blades with drive replacement |
1 pc |
3 670,97 |
92 |
Shutdown of equipment and CL 0.4 kV at the user’s request in case of repairs |
1 shutdown |
828,99 |
93 |
Energization of equipment and CL 0.4 kV at the user’s request in case of repairs |
1 energization |
830,74 |
94 |
Shutdown of equipment and CL 6-10 kV at the user’s request in case of repairs |
1 shutdown |
4 913,85 |
95 |
Energization of equipment and CL 6-10 kV at the user’s request in case of repairs |
1 energization |
6 076,57 |
96 |
Acceptance of DP (distribution point) and TS into operation |
1 acceptance |
19 312,16 |
97 |
Determination of CL route up to 100 m |
1 determination |
6 224,78 |
98 |
Determination of CL route for each subsequent 100 m |
1 determination |
1 290,42 |
99 |
Determination of the location of damage on CL-0.4 kV |
1 determination |
9 221,97 |
100 |
Determination of the location of damage on CL-6-10 kV |
1 determination |
11 776,04 |
101 |
Determination of the location of damage on CL-35 kV |
1 determination |
15 049,25 |
102 |
Specification of the location of damage on CL-0.4-35 kV |
1 determination |
3 641,78 |
103 |
Repair of lighting network in TS |
10 m |
859,82 |
104 |
Repair of bus disconnector 0.4 – 10 kV |
1 pc |
1 297,84 |
105 |
Repair of load switch cell |
1 pc |
2 028,53 |
106 |
Re-tightening of wire 0.4 kV |
1 км |
1 350,5 0 |
107 |
Preparation for energization of newly installed CTS (closed transformer substation) |
1 TS |
1 468,05 |
108 |
Preparation for energization of newly installed DP |
1 DP (up to 10 cells) |
2 084,71 |
109 |
Preparation for energization of newly installed mast TS |
1 TS |
569,6 0 |
110 |
Preparation for energization of newly installed PTS (Packaged transformer substation)(EPTS) (external package transformer substation) |
1 PTS (EPTS) |
939,53 |
111 |
Taking technical measures ensuring safety of the production of works by an outside organization |
1 job ticket |
43 157,25 |
112 |
Acceptance of OPTL and CL 6-10 kV into operation |
1 acceptance |
4 308,19 |
113 |
Acceptance of OPTL and CL 0.4 kV into operation |
1 acceptance |
6 454,63 |
114 |
Drilling of pits for supports 0.4 – 10 kV |
1 pit |
378,47 |
115 |
Consultation and issuance of final statements on technical matters of power engineering |
1 hour |
606,95 |
116 |
Услуги по продлению технических условий после окончания срока их действия (срочно с К = 1,5) |
1 ТУ |
474,2 |
117 |
Services for extension of the specification after termination of their validity period (urgently with K = 1.5) |
1 Spec/span> |
986,12 |
118 |
Painting of TS doors |
1 TS |
61,29 |
119 |
Phase sequence of CL and electrical equipment |
1 CL |
2 941,34 |
120 |
Support numbering |
1 support |
626,82 |
121 |
Application of dispatcher names |
100 characters |
541,28 |
122 |
Execution of the certificate of delimitation of operating responsibility of the parties and/or certificate of delimitation of balance belonging of electrical grids |
1 package / certificate |
1 180,00 |
123 |
Re-execution of the certificate of operating responsibility of the parties and/or certificate of delimitation of balance belonging of electrical grids |
1 package / certificate |
1 180,00 |
124 |
Development and issuance of specification for connection to UPC JSC’s networks |
1 Spec |
1 456,49 |
125 |
Execution of the certificate of inspection of electrical installations |
1 certificate |
1 180,00 |
126 |
Execution of schematic circuit diagrams |
1 diagram |
2 400,00 |
127 |
Execution of the certificate of technological connection |
1 certificate |
1 180,00 |
128 |
Inspection of electrical installation up to 15 kW |
1 electrical installation |
5 993,64 |
129 |
Inspection of electrical installation from 15 to 100 kW |
1 electrical installation |
10 001,63 |
130 |
Inspection of electrical installation from 100 kW |
1 electrical installation |
15 933,45 |
131 |
Issuance of specification having no relation to technological connection (modification of power supply diagram, relocation of electrical installation, etc.) |
1 specification |
7 276,20 |
132 |
Maintenance of 1 c.u. (conventional unit) of electrical equipment: |
|
|
132.1 |
1st reliability category |
|
8 596,25 |
132.2 |
2nd reliability category |
|
7 475, 00 |
132.3 |
3rd reliability category |
|
6 500,00 |
133 |
Operating maintenance of 1 c.u. of electrical equipment: |
|
|
133.1 |
1st reliability category |
|
15 208,75 |
133.2 |
2nd reliability category |
|
13 225 ,00 |
133.3 |
3rd reliability category |
|