Trouble-free electrical power supply

UPC JSC's key competence is uninterruptible electrical power supply to connected users

Trouble-free electrical power supply

Services

 

Kinds of works (services)

Unit

Cost, rub (including VAT – 18 %)

1

Preparation of documents and issuance of permits to execute earth-moving works

1 package of documents

2718,52

2

Coordination of design documentation

1 coordination

12 566,74

3

Participation in the working commission for acceptance of equipment after installation (reconstruction)

1 acceptance

4 290,21

4

Diagnostics of power transformers 6-10 kV

1 test

4 745,12

5

Diagnostics of power transformers 35 kV

1 test

9 398,02

6

Dismantling/mounting of branches from OPTL (overhead power transmission lines) to the entry into buildings

1 km

1 251,05

7

Installation of wire/cable from support to the entry into the building without dummy support 0.22 kV

1 km

869,73

8

Installation of wire/cable from support to the entry into the building without dummy support 0.38 kV

1 km

1 066,18

9

Installation of single-phase entry of OPTL, CL-0.4 kV for utility mains

1 connection

2 518,85

10

Installation of three-phase entry of OPTL, CL-0.4 kV for utility mains

1 connection

3 461,12

11

Installation of the lead-in of user electrical installations in networks of OPTL, CL-0.4 kV for organizations

1 connection

3 690,31

12

Installation of the lead-in of user electrical installations in networks of OPTL, CL-6-10 kV

1 connection

9 395,33

13

Installation of vertical riser cable on support

5 м CL

1 712,98

14

Installation of terminal heat shrink coupling (without the cost of materials)

1 pc

4 629,48

15

Installation of connecting heat shrink coupling (without the cost of materials)

1 pc

7 037,58

16

Installation of DB (distributing board) on support

1 pc

2 617,39

17

Access clearance of outside adjustment organizations to DB and TS

1 access clearance

8 788,52

18

Access clearance to works and supervision of work production in the protection area

1 access clearance

3 264,26

19

Access clearance for the personnel of contracting organization during installation works on CL-0.4 – 10 kV

1 access clearance

6 429,1 0

20

Access clearance for the personnel of contracting organization during installation works on OPTL-0.4 kV

1 access clearance

6 127,02

21

Access clearance for the personnel of contracting organization during installation works on OPTL-10 kV with wire lowering

1 access clearance

9 939,12

22

Access clearance for the personnel of contracting organization during installation works on OPTL-10 kV without wire lowering

1 access clearance

8 351,79

23

Testing of TS equipment with one transformer

1 test

8 873,84

24

Testing of TS equipment with two transformers

1 test

13 461,12

25

Testing of voltage transformer 6-10 kV

1 test

2 879,29

26

Testing of power transformers

1 test

5 188,57

27

Testing of voltage transformers and current transformers

1 test

3 383,92

28

Testing of measuring current transformers

1 transformer

7 467,14

29

Checkout of current transformers

1 transformer

5 866,74

30

High-voltage testing of equipment for cells 6-10 kV

1 test

9 840,77

31

High-voltage testing of equipment for 1 cell 6-10 kV

1 test

5 647,65

32

Testing of power cables 6-10 kV

1 test

9 702,56

33

Testing of power cables 0.4 kV

1 test

8 215,12

34

Testing of valve-type arresters 6-10 kV

1 test

4 837,53

35

Testing of switch 6-10 kV

1 test

10 679,95

36

Testing of electrical installations for an individual dwelling house

1 test

3 657,95

37

Testing of CL-35 kV

1 test

7 183,62

38

Testing of full resistance of “phase-zero” loop

1 test

2 107,31

39

Check of the presence of circuit between grounding wire and grounded elements (100 points)

1 test

1 193,69

40

Primary current injection test for single-pole circuit breaker

1 test

333,35

41

Primary current injection test for three-pole circuit breaker up to 50 A

1 test

833,37

42

Primary current injection test for three-pole circuit breaker up to 200 A

1 test

1 166,73

43

Primary current injection test for three-pole circuit breaker over 200 A

1 test

1 500,06

44

Measurement of the resistance of TS grounding circuit

1 circuit

8 262,55

45

Measurement of the resistance of support grounding circuit

1 circuit

2 568,37

46

Measurement of insulation resistance

1 test

1 728,61

47

Measurement of the resistance of transformer windings 35 kV against alternating current

1 measurement

4 575,48

48

Measurement of the resistance of transformer windings 35 kV against direct current

1 measurement

1 095,33

49

Measurement of distances from wires of OPTL-0.4 – 10 kV to the ground surface

1 measurement

576,25

50

Replacement of automatic device up to 400 A

1 automatic device

2 944,51

51

Replacement of automatic device over 400 A

1 automatic device

3 333,3 0

52

Replacement of automatic device over 1,000 A

1 automatic device

3 929,33

53

Replacement of load switch

1 pc

4 196,42

54

Replacement of light panel

1 pc

8 193,04

55

Replacement of strut

1 pc

2 034,45

56

Replacement of fuse

1 pc

318,96

57

Replacement of main switch up to 400 A

1 pc

2 302,15

58

Replacement of main switch over 400 A

1 pc

5 025,48

59

Replacement of the segment of CL-0.4 – 10 kV up to 5 metres (the first 5 metres)

1 segment

2 078,02

60

Replacement of arresters

1 pc

2 325,29

61

Replacement of low voltage output terminals

1 pc

2 944,51

62

Replacement of lighting fixtures with mercury lamp on supports

1 pc

2 413,45

63

Replacement of lighting fixtures with mercury lamp on supports

1 pc

2 177,55

64

Replacement of lighting fixtures with luminescent lamp on supports

1 pc

1 072,05

65

Replacement of lighting fixtures with filament lamp on supports

1 pc

612,4 0

66

Replacement of mercury lamps for street illumination

1 pc

535,9 0

67

Replacement of filament lamps for street illumination

1 pc

427,85

68

Replacement of start-regulating devices in the lighting fixture

1 pc

861,35

69

Replacement of the lighting fixture bracket

1 pc

737,45

70

Replacement of linear disconnector with grounding blades without replacement of drive

1 pc

2 087,98

71

Device for repeated grounding and grounding circuit of OPTL-0.4 kV

1 segment

5 354,48

72

Installation (replacement) of current transformer (TPL, TK-20)

1 pc

1 384,77

73

Installation (replacement) of single-phase single-tariff meter (metering device is included into the cost of services)

1 pc

1 550,00

74

Installation (replacement) of single-phase single-tariff meter with circuit breaker (materials and metering device are included into the cost of services)

1 pc

1 890,00

75

Installation (replacement) of single-phase double-tariff meter (metering device is included into the cost of services)

1 pc

2 350,00

76

Installation (replacement) of single-phase double-tariff meter with circuit breaker (materials and metering device are included into the cost of services)

1 pc

2 650,00

77

Installation (replacement) of three-phase single-tariff meter (metering device is included into the cost of services)

1 pc

2 970,00

78

Installation (replacement) of three-phase single-tariff meter with circuit breaker (materials and metering device are included into the cost of services)

1 pc

3 240,00

79

Conduction of instrumental checkout of the electricity metering station

1 checkout

1 010,00

80

Cut-off of OPTL and CL 0.4 kV according to application of the sales organization

1 cut-off

2 150,00

81

Energization of OPTL and CL 0.4 kV according to application of the sales organization

1 energization

2 150,00

82

Installation (replacement) of valve-type arrester RVO-10

1 pc

488,8 0

83

Installation (replacement) of valve-type arrester RVO-0.5

1 pc

468,42

84

Alignment of support 0.4 – 10 kV

1 pc

1 779,1 0

85

Installation of reinforced concrete attachment

1 pc

1 578,95

86

Installation of insulators on mounted support

1 pc

529,39

87

Installation of grounding lowering on reinforced concrete support 0.4 – 10 kV

1 pc

676,69

88

Installation of grounding lowering on wooden support 0.4 – 10 kV

1 pc

693,95

89

Installation of TS grounding circuit

1 pc

5 628,86

90

Installation of linear disconnector without grounding blades without drive replacement

1 pc

2 407,97

91

Installation of linear disconnector without grounding blades with drive replacement

1 pc

3 670,97

92

Shutdown of equipment and CL 0.4 kV at the user’s request in case of repairs

1 shutdown

828,99

93

Energization of equipment and CL 0.4 kV at the user’s request in case of repairs

1 energization

830,74

94

Shutdown of equipment and CL 6-10 kV at the user’s request in case of repairs

1 shutdown

4 913,85

95

Energization of equipment and CL 6-10 kV at the user’s request in case of repairs

1 energization

6 076,57

96

Acceptance of DP (distribution point) and TS into operation

1 acceptance

19 312,16

97

Determination of CL route up to 100 m

1 determination

6 224,78

98

Determination of CL route for each subsequent 100 m

1 determination

1 290,42

99

Determination of the location of damage on CL-0.4 kV

1 determination

9 221,97

100

Determination of the location of damage on CL-6-10 kV

1 determination

11 776,04

101

Determination of the location of damage on CL-35 kV

1 determination

15 049,25

102

Specification of the location of damage on CL-0.4-35 kV

1 determination

3 641,78

103

Repair of lighting network in TS

10 m

859,82

104

Repair of bus disconnector 0.4 – 10 kV

1 pc

1 297,84

105

Repair of load switch cell

1 pc

2 028,53

106

Re-tightening of wire 0.4 kV

1 км

1 350,5 0

107

Preparation for energization of newly installed CTS (closed transformer substation)

1 TS

1 468,05

108

Preparation for energization of newly installed DP

1 DP (up to 10 cells)

2 084,71

109

Preparation for energization of newly installed mast TS

1 TS

569,6 0

110

Preparation for energization of newly installed PTS (Packaged transformer substation)(EPTS) (external package transformer substation)

1 PTS (EPTS)

939,53

111

Taking technical measures ensuring safety of the production of works by an outside organization

1 job ticket

43 157,25

112

Acceptance of OPTL and CL 6-10 kV into operation

1 acceptance

4 308,19

113

Acceptance of OPTL and CL 0.4 kV into operation

1 acceptance

6 454,63

114

Drilling of pits for supports 0.4 – 10 kV

1 pit

378,47

115

Consultation and issuance of final statements on technical matters of power engineering

1 hour

606,95

116

Услуги по продлению технических условий после окончания срока их действия (срочно с К = 1,5)

1 ТУ

474,2

117

Services for extension of the specification after termination of their validity period (urgently with K = 1.5)

1 Spec/span>

986,12

118

Painting of TS doors

1 TS

61,29

119

Phase sequence of CL and electrical equipment

1 CL

2 941,34

120

Support numbering

1 support

626,82

121

Application of dispatcher names

100 characters

541,28

122

Execution of the certificate of delimitation of operating responsibility of the parties and/or certificate of delimitation of balance belonging of electrical grids

1 package / certificate

1 180,00

123

Re-execution of the certificate of operating responsibility of the parties and/or certificate of delimitation of balance belonging of electrical grids

1 package / certificate

1 180,00

124

Development and issuance of specification for connection to UPC JSC’s networks

1 Spec

1 456,49

125

Execution of the certificate of inspection of electrical installations

1 certificate

1 180,00

126

Execution of schematic circuit diagrams

1 diagram

2 400,00

127

Execution of the certificate of technological connection

1 certificate

1 180,00

128

Inspection of electrical installation up to 15 kW

1 electrical installation

5 993,64

129

Inspection of electrical installation from 15 to 100 kW

1 electrical installation

10 001,63

130

Inspection of electrical installation from 100 kW

1 electrical installation

15 933,45

131

Issuance of specification having no relation to technological connection (modification of power supply diagram, relocation of electrical installation, etc.)

1 specification

7 276,20

132

Maintenance of 1 c.u. (conventional unit) of electrical equipment:

132.1

1st reliability category

8 596,25

132.2

2nd reliability category

7 475, 00

132.3

3rd reliability category

6 500,00

133

Operating maintenance of 1 c.u. of electrical equipment:

133.1

1st reliability category

15 208,75

133.2

2nd reliability category

13 225 ,00

133.3

3rd reliability category

11 500 ,00

 


 

 

 

© 2022 UNITED POWER COMPANY JSC

-->